MIL-PRF-44466D
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classified as
follows:
a. First article inspection (see 4.1.1)
b. Conformance inspection (see 4.1.2)
4.1.1 First article inspection. When a first article inspection is required (see 3.1 and 6.2), a
sample shall be examined for all the verifications listed in table I.
4.1.2 Conformance inspection. Conformance inspections of the HWR shall consist of all the
verifications listed in table I, except the verification testing specified for the requirements of
paragraphs 3.2.1 through 3.2.3, 3.2.6.2 and 3.2.6.3, 3.4.1, 3.4.5 and 3.5.1 through 3.5.6. shall not
be done. Sampling for this inspection shall be as specified in the contract or order (see 6.2).
4.2 Order of verification. The verifications listed in table I can be performed in any sequence,
but the verifications for table II shall be performed in the sequence specified.
TABLE I. Verification methods
Title
Requirement
Verification
Title
Requirement
Verification
3.4
4.3.4
3.2
4.3.2
OPERATING
SUPPORT OR
REQUIREMENTS
OWNERSHIP
REQUIREMENTS
Temperature selection
3.2.1
4.3.2.1
Reliability
3.4.1
4.3.4.1
settings
Heating water
3.2.2
4.3.2.2
Weight
3.4.2
4.3.4.2
Heating rations
3.2.3
4.3.2.3
Maintainability
3.4.3
4.3.4.3
Capacity
3.2.4
4.3.2.4
Electrical wiring
3.4.3.1
4.3.4.4
Control panel
3.2.5
4.3.2.5
Marking
3.4.4
4.3.4.5
Safety
3.2.6
4.3.2.6
Identification plate
3.4.4.1
4.3.4.5.1
Pressure relief
3.2.6.1
4.3.2.7
Instruction plate
3.4.4.2
4.3.4.5.2
Automatic shutdown
3.2.6.2
4.3.2.8
Durability
3.4.5
4.3.4.6
Spillage
3.2.6.3
4.3.2.9
3.5
4.3.5
ENVIRONMENTAL
REQUIREMENTS
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business